NEO Tech Logo



Current Suppliers

SELLER (Supplier) Responsibilities:

The SELLER shall ensure that they have the latest revision of the documents, as noted below.
The SELLER shall meet the BUYER flow down requirements, as applicable; such as:

  • Purchase Order ‘Terms and Conditions’
  • Quality Clauses (‘Default‘ and ‘Additional)
  • Requirements stated during the quoting process or on the supplied drawings / SCD
  • PCB Fabrication Specification

The SELLER shall review NEO Tech document NT104 and determine the appropriate Quality Clause table that is applicable to the commodity / service and determine the which Quality Clauses apply for each purchase order line:

  • Default
  • Additional

Additional’ Quality Clauses can be invoked on a purchase order line, and is  invoked in addition to the ‘Default’ Quality Clauses in the applicable tables referenced in document NT104:

  • Listed on the purchase order
  • Invoked per ‘Default‘ Quality Clause 199x, 299x or 399x (‘Additional’ Invoked Quality Clauses by NEO Tech Site)
  • Requirements stated on the supplied drawings / specifications

NOTE:  The ‘Additional’ invoked Quality Clauses only apply if the Quality Clause is listed for that commodity / service in the bottom section of the applicable Quality Clause table.  If the invoked Quality Clause is not listed for the commodity / service, then it does not apply to that commodity / service.

Purchase Order ‘Terms and Conditions’
(NT402 Rev A)

  • Acceptance of this Purchase Order confirms SELLER’s ability to supply parts and services, and acceptance of stated prices.
  • Delivery dates: The delivery due date on the NEO Tech Purchase Order is the required date at NEO Tech receiving; SELLER ship date should be prior to the Purchase Order due date taking number of days of transit time into consideration.
  • Any change to the Purchase Order; including pricing, quantity, or specifications, must be approved by NEO Tech supply chain team prior to shipping.
  • Download the latest revision of the NEO Tech ‘PO Terms and Conditions’ document with the hyperlink shown above.

Quality Clauses
(NT104 Rev B)

  • Download the latest revision of the NEO Tech ‘Quality Clauses’ document with the hyperlink shown above.
  • Review the applicable ‘Quality Clauses Table’ in the ‘Quality Clauses’ document.  Locate the applicable part commodity (or service) in the header and determine which ‘Default‘ Quality Clauses have been invoked in that column.
  • Determine any ‘Additional‘ Quality Clauses that have been invoked, as described above in the ‘Supplier Responsibilities’.
  • Review the Quality Clause descriptions in the ‘Quality Clauses’ document for the invoked Quality Clauses (‘Default’ and ‘Additional’) and ensure their compliance.

PCB Fabrication Specification
(NT404 Rev B)

  • Download the latest revision of the NEO Tech ‘PCB Fabrication Specification’ document with the hyperlink shown above, when applicable.

Supplier Portal

Access your account from our Client Login Page.

How to become a NEO Tech Supplier

To be considered as a future supplier for NEO Tech, please provide the information requested below.

How to become a NEO Tech Supplier

Your form will be submitted to our Supply Chain Department.

If we find your services to be a fit for NEO Tech, you will be contacted by our team member.

“Raytheon is very pleased with NEO Tech and we are
NOT easy to please”

 Chairman and former CEO, Raytheon

"Collaboration, communication and cooperation
trump lowest price"

COO, Oraya

"It was like having an internal manufacturing operation
without the overhead"

President and CEO, Oraya

"The middle ground is a little hard to identify, and we needed to find someone flexible enough to play both games"

President and CEO, Oraya